Mass Line – Polymer EV Battery
Degassing is performed in the degassing chamber after putting the tray loaded with the cell. After that, final sealing, cutting, testing and unloading the OK cell. There are one side cell dedicated line and both side cell dedicated line.
UNIT : Loading, Degassing1, Degassing 2, Final Sealing, Unloading
Degassing is performed in the degassing chamber after putting the tray loaded with the cell. After that, final sealing, cutting, testing and unloading the OK cell. There are one side cell dedicated line and both side cell dedicated line.
UNIT : Loading, Degassing1, Degassing 2, Final Sealing, Unloading
- One side cell dedicated line & Both side cell dedicated line
- 2 Degassing units are simultaneously proceed
( for speed, Unload 4Cells each) - Degassing unit : Turn Table type
- There is loadcell in a final sealing unit
- MES system : cell tracking possible
Production Speed | 10 ~ 15 PPM | |
---|---|---|
Cell Size (mm) | Length | 100 ~ 200 |
Width | 120 ~ 250 | |
Height | 3 ~ 12 | |
Capacity | 20 ~ 50 Ah | |
Option | Siemens PLC, CE Mark, UL Mark |
TECHLAND
Techland Vision
Based on the fact the exploring the truth os our motif to achieve high technology, it is Techland’s goal.
To connect with and touch our customers.
Holding Technology
- Application Technology for Vision
- Application Technology for Dispenser
- Control Technology for Rlbot & Servo
- Design Skill for High-speed Cam
- Application Technology for Welding (Laser, spot, ultrasonic)
- Operation of Various PLC (siemens, mitsubishi, omron etc.)
Strength
- The Veteran Core Technician
- The Best Regular Overhaul & Warranty
- A self Design & Manufacture Skill
- Design Skill for Long Life Cycle
- Having Company Loyalty, Responsibility(A low Turnover)
- 70% Market Share of Pilot Scale in Korea